Terradyn Consultants, LLC. | Thornton Academy
96
portfolio_page-template-default,single,single-portfolio_page,postid-96,ajax_fade,page_not_loaded,,qode_grid_1300,footer_responsive_adv,hide_top_bar_on_mobile_header,qode-content-sidebar-responsive,qode-theme-ver-10.0,wpb-js-composer js-comp-ver-4.12,vc_responsive
 

Thornton Academy

Thornton Academy

Terradyn’s staff has performed Master Planning and Civil Engineering services on the historic 76-acre campus in Saco, Maine since 2008. Projects have including the Stasio residence Hall (2008), additions to the Thornton Academy Middle School (2012) and High School (2014), new softball and multipurpose athletic fields (2011), tennis courts (2010), outdoor basketball court (2014), renovations to Hill Stadium (2011), and the construction of Dormitory 3 (2017). The Hill Stadium improvements included replacing the natural turf field with a state of the art synthetic turf surface, repaving and resurfacing the athletic track, installing stadium lighting, and modifying the stadium bleachers.

Project Location: Saco, Maine

Year Completed: Ongoing

Entitlements:

City of Saco Site Plan Approval

Maine DEP Site Location of Development Permit

Maine DEP Natural Resource Protection Act Permit

Date
Category
Institutional